EQUIPMENT DETAILS
YouTube Thumbnail
Thumbnail 1
Thumbnail 2
Thumbnail 3
Thumbnail 4
Product item
Product item
Product item
Product item

Artec Metrology kit: Professional

Artec 3DShowroom
ON REQUEST
€34 100,00(tax excl.)
Return & Refunds Policy
Delivery: 1–4 months after confirmation. Final timeline confirmed by our manager.
-
+
Protected by Topotronix
1. Escrow paymenti
Funds are held until the deal is verified.
2. Quality Controli
Equipment can be inspected before delivery.
3. Support until deliveryi
Our team supports the process until completion.

ITEM'S SPECIFICS

Brand
Artec 3D
Model
Metrology kit: Professional
Condition
New
Year of manufacture
2026
Height, cm
52
Length, cm
43
Width, cm
25
Weight, kg
12

ITEM'S DESCRIPTION

Advanced Photogrammetry System for Maximum Precision Industrial Measurement

Artec Metrology Kit Professional is a high-end optical coordinate measuring system developed for demanding industrial applications requiring the highest level of accuracy, repeatability, and volumetric precision.

Designed for advanced inspection, deformation analysis, aerospace and automotive engineering, and large-scale reverse engineering, the Professional version delivers metrology-grade performance with enhanced camera resolution and superior measurement accuracy.

This solution operates both as a standalone optical measurement system and as a high-precision referencing tool for Artec 3D scanners, significantly increasing volumetric accuracy over long distances.

Key Advantages

Ultra-High Precision Optical Measurement
• Point-based accuracy (RMS): up to 0.002 mm + 0.005 mm/m
• Length measurement accuracy (MPE):
0.015 mm + 0.015 mm × length (m)
• Enhanced volumetric accuracy when combined with Artec scanners
• Designed for high-repeatability industrial and metrology-grade tasks

The Professional version ensures maximum confidence in applications where even micron-level deviations matter.

Advanced Photogrammetry Workflow
• 30.3 MP digital camera (Canon EOS R)
• 28 mm AICON metric wide-angle lens
• High-resolution image acquisition for superior target detection
• Adjustable professional camera settings
• Optimized for complex and large-scale measurement projects

Using the Metrology Kit plugin inside Artec Studio, users can generate an ultra-precise target cloud and seamlessly integrate it with 3D scanning data for complete measurement and inspection workflows.

Standalone or Referencing System

The Professional version can be used as:

✔ A standalone 3D optical coordinate measuring system
✔ A high-precision volumetric referencing tool for Artec scanners
✔ A deformation and structural analysis solution
✔ A measurement system for large and complex assemblies
✔ A precision enhancement solution for long-range 3D scanning

Photogrammetry data from the Professional version dramatically reduces accumulated error over distance and allows smaller field-of-view scanners to measure large objects with exceptional volumetric accuracy.

Portable & Industrial-Ready
• Rugged transport case
• Designed for workshop, factory, and field environments
• Suitable for unstable or dynamic conditions (dynamic referencing support)
• CE-compliant measurement system
• Built for high-demand industrial applications

The system is fully portable and engineered for reliable operation in production facilities, offshore environments, aerospace sites, and research laboratories.

What’s Included – Professional Version
• 30.3 MP digital camera (Canon EOS R)
• 28 mm AICON metric wide-angle lens
• Metrology Kit plugin for Artec Studio
• Adjustable professional camera settings
• Extended set of measurement targets
• Separate reference cross for complex and larger objects
• Scale bars for high-accuracy measurements
• DAkkS certificate for the complete measuring system
• Rugged transport case

Applications

The Professional version is ideal for:
• Aerospace structural analysis
• Automotive R&D and production inspection
• Offshore and heavy industry measurement
• Deformation and load analysis
• Large-scale industrial inspection
• Reverse engineering of complex assemblies
• Infrastructure and mechanical system verification
• High-precision manufacturing validation

Why Choose the Professional Version?

✔ Maximum metrology-grade accuracy
✔ Superior volumetric precision over long distances
✔ Advanced camera system for demanding environments
✔ Ideal for complex and large-scale industrial projects
✔ Seamless integration with Artec Studio and 3D scanners
✔ DAkkS-certified optical measurement system
✔ Designed for critical, mission-sensitive applications

Artec Metrology kit: Professional

Artec 3DShowroom
ON REQUEST
€34 100,00(tax excl.)
Return & Refunds Policy
Delivery: 1–4 months after confirmation. Final timeline confirmed by our manager.
-
+
Protected by Topotronix
1. Escrow paymenti
Funds are held until the deal is verified.
2. Quality Controli
Equipment can be inspected before delivery.
3. Support until deliveryi
Our team supports the process until completion.
verified_vendors
50+Verified vendors
qc_checks
251+QC checks
completed_deals
301+Completed deals